• HV & LV network installation & commissioning

  • HV & LV metering installation

  • HV & LV network modification

  • Cable pulling/installation
  • HV protection testing & grading studies

  • Senior authorised person provision

  • Thermographic surveys

  • Substation reinforcement

  • Authorisation, operation & safety courses

  • Network design

  • Total electrical facility management

  • HV & LV network maintenance
  • Emergency call out

OUR SERVICES INCLUDE

Unit 19 Liberty Close,
Woolsbridge Industrial Park,
Three Legged Cross, Wimborne, BH21 6SY

VISIT US
  • Black LinkedIn Icon
  • Black Facebook Icon
  • Black Twitter Icon
  • Black Google Places Icon
CALL US
01202 814466

© 2016 by Energy Network Services.

Proudly created by Landmark Creative Studios

YOUR ‘ONE CALL, ONE PARTNER’ SERVICE SOLUTION

Our working philosophy is simple: ‘The answer’s yes. Now, what’s the question?’ We really do deliver a ‘one stop shop’ service solution for all low and high power network problems.

Right from investigating and repairing an asset or cable fault through to providing a grading survey for your protection equipment, you’ll find our solutions complete, cost effective and highly convenient to simplify your communications, administrative and management processes.

Energy Network Services means one point of contact, one call, one partner and one result - your improved operational efficiency.

Peace of mind is designed and built into our service.

We are:
 

  • Fully insured to operate in the high voltage working environment
     

  • Active members of the Energy Networks Association so we -and you - are kept up to date with information regarding Dangerous Incidents
     

  • Registered members of the Electrical Contractors Associatio
     

  • We have obtained Lloyds Register Quality Assurance ISO 9002 accreditation for our quality and operational procedures, and also Lloyds National Electricity Registration Scheme accreditation.
     

  • Committed without compromise to health and safety in the power industry. Every project starts with a full risk assessment of the works involved before methods’ statements are put forward to minimise any highlighted risks and ensure a safe system of work is adhered to.